HomeHistoryCommunityArchitectureFundersJoin usNewsPress
The New Towner Trust

News

Building Progress Photo Gallery

December 2006

second floor view towards the seafront      second floor viewed east towards the Congress Theatre

The second floor slab is being built with columns (seen here in yellow formwork in the photo on the left) rising to the new roof where the plant room will be located.

November 2006

left side of the new building        rear of the new building next to the Congress Theatre

These photos show the building clad in sheeting which provides protection from the wind as well as additional safety benefits.  The photo on the left, clearly shows the formwork used to give the building its signature curved outside wall.  The photo on the right shows the building next to the Congress Theatre back stage entrance.

October 2006

Works on the first floor viewed from the Congress Theatre roof         Views of the Downs from the second floor level

Work continues on the first floor, with columns and walls rising to the second floor now begining to appear.

view of front of the new building next to the Congress Theatre          concrete wall on first floor