Building Progress Photo Gallery

March 2006

Foundations near completion                       Excavated lift pit

Pile caps exposed awaiting final concreting.   Excavations for the construction of the lift pit which will house the lift machinery.    

February 2006

Piling rig with concrete being pumped into the ground

Piling rig with concrete being pumped deep into the ground.

January 2006

Piling Rig

Arrival of the 19 metre high piling rig in preparation for the foundations.